The IT/OT readiness assessment asks twelve questions. For each one you choose Unknown / absent (0 points), Partly in place (1 point) or Verified (2 points), for a maximum of 24. All questions weigh the same. The score is a conversation starter for the kickoff meeting, not a benchmark and not a certification.
The one rule that matters: choose Verified only when you can point at current evidence. “We think so” is Partly in place. This article explains what evidence to look for in each question, grouped by theme.
The tool sorts the questions you did not mark as verified, weakest first, and turns each into an action. Resist the urge to fix everything at once. Pick the two or three lowest-scoring items that block your goal in question 1, assign owners and dates, and re-run the worksheet at the next review. If you want to discuss the plan with ASP Dijital, the tool can open the contact form with a summary you can edit before sending. The wider sequence for the first month is in the first 30 days of an IT/OT project.